Purpose

This is a blog containing the build history of an experimental home built airplane. The RV-7A is a two place, piston powered, low wing, tractor configuration, tricycle gear, aluminum and composite aircraft. The original purpose of this blog was to document the construction of my experimental category aircraft in order to satisfy the build log requirement for the FAA. Now it's just for the amusement of friends and family as I document some of our aviation experiences. For more information on the RV series of aircraft see www.vansaircraft.com.

Wednesday, January 22, 2014

Step 11.0, Finish kit

At very long last the finish kit has arrived.  The finish kit was ordered from Van's in the last week of September anticipating an 8 week delivery time.  By the time December rolled around I was expecting delivery at any time...  Tick, tock... At the end of December I called Van's to inquire.  It turns out they mailed me a confirmation of my order on October 7 that itself requires a confirmation.  Since I did not receive this confirmation requiring a confirmation, my order was unconfirmed!  Consequently, my order was stalled -- indefinitely, I presume since they already had accepted my deposit and had written authorization to charge the balance to my credit card.

Still, I remained busy on the project during the wait so I can't be too angry about the mix up.  I just feel like I spent a lot of time wondering when, and planning for, the finish kit arrival.  If only I had realized that I had an additional 6 weeks of lead time on this order, I might have been more productive.  Perhaps this might have been a good time to take on Middle East peace or cancer.


And so began the inventory.  The packing list is spread out along the nearest horizontal surface, in this case the right wing.  One at a time the pieces come out of the box, are checked off the list, and then are carried upstairs for temporary storage.


So what's in the finish kit?  Well, not nearly so much as your bank account might expect.  The big items are the canopy, and the fiberglass parts such as the cowling and wheel pants and fairings.  There are also the wheels, brakes, front landing gear leg, swiveling nose wheel fork, and motor mount.



And so it goes.

Saturday, January 11, 2014

Step 10.8, Forward deck

The forward deck is the structure from the instrument panel to the fire wall above the foot well.  There are a lot of little flanges and fiddly bits to fabricate.  They don't take too long so it's best to just power through it.

Which brings me to the frustration of the week:  One might assume that is is possible to complete a sub kit like, oh, let's say hypothetically, the fuselage kit without needing parts from the next kit.  Well, one would be very wrong because in at least two instances that I have run in to recently I have needed parts from the finish kit which I have not yet received.  Specifically, the wing root fairings which are to be fit during the first wing fitting and the F-697 top hat piece which is needed during the front deck assembly.  Both of these parts are called out in the manual during the fuselage assembly but are not provided until the finish kit. Arrgh!  Neither are real show stopppers, but I wasted a lot of time looking for them only to find out that they haven't yet arrived.

The front deck begins with the aforementioned flanges which begin life as aluminum angle of various thicknesses.


They each get cut and drilled in some way,  a few being to get by without having a corner lopped off.  Most of these will be used to mount the instrument panel.



Instrument pannel.


Here are the ribs that make the front deck frame.


I need to make a cut out in the center to accommodate some of the avionics that are a little deeper than Van had originally planned for. 


I will cleco this thing to together prior to a test fit on the fuselage.



Now it's all riveted in place.  The top skin will not be riveted down until everything is complete with in the forward fuselage area.  

So here is a sneak preview on what I'm planning for the panel.  The avionics manufacturers provide full sized stickers of their offerings for panel planning purposes, but I decided not to avail myself of their sticky backed feature.  I'm just using masking tape so I can move them around much easier.


That's it for this week.

Wednesday, January 1, 2014

Year 2 retrospective

Unwavering and implacable, time advances.  January 1, 2014 marks the second anniversary of this project. To me, it seems the pace would challenge a snail's attention and yet, it is remarkable how much has been accomplished in just one year.

On New Year's day 2013, I was still 3 1/2 months shy of completing the wings.  Among other things, I still had the top skins to rivet, and the wing tips fit.





By mid April the fuselage arrived.  I plowed through the fire wall and then began the unending series of ever smaller bulkheads that make up the tail cone structure.


And then came the dreaded bending of the longerons.  It turns out this process is only 95% as bad as its online reputation.  I really could not recommend it for its entertainment value, but as an educational tool, well, let's just say it's an education all by itself.  One is not likely to fully appreciate what an obstinate thing aluminum angle can be -- until you try to beat a curve in to it.



With the longerons shaped, the tail cone was next.



And that was followed by the center section.



Which led to the forward section and the side skins.


Then a rotisserie was constructed.



The tail cone top skin, baggage compartment interior panels and seat pans were next.





At some point the propeller arrived.


And we finished the seat backs. Carol took the first ride.


I'm not sure, but she appears to be steering by reins.  Either way, she's an unconventional pilot flying from the right hand seat.


Eventually, it was time to attach the wings and set their incidence.


And the horizontal and vertical stabilizers were bolted on.


Finally, the roll bar was set.


All of which brings us to the present. Here's to all of the progress of 2013.


Season's Greetings and Best wishes in 2014.

Wednesday, December 25, 2013

Step 10.7, Roll bar

I don't know if I was having as much fun as my puppy, but it sure was good to get back to some basic construction.  In this post I am fabricating the roll bar.



The roll bar is designed to protect the noggin in the unlikely event of an unplanned inverted dirt landing.  The basic construction is a curved U-channel of pressed aluminum spaced apart by narrow strips of 0.063" sheet aluminum.  Here are the basic parts:


Some access holes are cut into the aft sides at the base and then the parts are laid out on the bench where the splice plate can be match drilled and then riveted to the center of the arch.


A splice plate is fabricated for the aft piece as well.  The aft piece also gets a bit of angle to mount the roll bar support that ties the top of the bar to the top to the fuselage.  This is probably thought to prevent the bar from laying over -- With any luck, I'll never have to find out if it is up to the challenge.



The narrow strips are cut to length and and then match drilled to the forward arch piece



Match drilling.

And riveted.  The inside strip is next.

Followed by the other half of the roll bar to complete the tube.

There are a number of flanges that are fabricated from various thicknesses of angle that are needed to attach the roll bar to the fuselage.  Carol has come down to bang out a few..


Here are two that will hold the outside of the base.


The bar is canted aft so the attachment flanges are cut back to reflect that angle.


The bottom of the bar has to nest within the inside of the angle brackets, so the corners are radiused with a Scotch Brite wheel.


Here the two brackets on each side are shown clamped in place prior to match drilling.


Oops.  The L-shaped brackets are the wrong way around.  The smaller of the two should be on the bottom.


That's better.  I should have known something was wrong when I felt a blissful surge of intuitive correctness about the assembly.  That just never happens.  Oh well, better off correct than aesthetically pleasing.

The U shaped channel at left attaches to the top of the roll bar and keeps it from folding over.  I have elected to add a bottom piece to it to give me a place to mount a baggage compartment light and for a more finished appearance.  I found some left over 0.025 sheet aluminum that was large enough and the thickness seems about right.  I'm going to mount the cover inside the U channel so that I can put the nut plate fasteners on on cover instead of inside the channel.  This will probably be easier although either way is do-able.



Now I'm back to the L brackets.  The outside piece has to be tapered down to match the curve of the fuselage.  I start out with the Vixen file because there is quite a lot of material to remove.  It turns out that on this particular piece, the filing is making a very loud high pitched noise.  I decide I'd better move it over to the belt sander before my puppy files a grievance.


I finally get the taper right and begin the final installation with counter sinks for two attachment screws.  You can see the taper in the edge of the counter sink.


Then the U channel is attached to the roll bar.



Then a quick run through the pait booth.  Here is the roll bar drying on a pile of interior panels.  


Here is the custom bottom piece.  I put it in place temporarily so that I could get the proper spacing on the two rivets on the sides.  The top is also riveted to the top skin.


And now...  The roll bar is finished.  Painted and bolted down.  Ain't it purdy.